Got a bunch of hard stuff done today and yesterday. I've also been "Greening" the original list in update 3.
The weather here has been Pacific Northwest perfect for like 3 weeks now. And I've been capitalizing on my time on the boat, which has had the unfortunate and opposite effect on our yard. I think I'm going to have to water the flowers tomorrow and cut the grass.
So here's the break down so far.
Monday and Tuesday I worked on:
1. Installed two bank battery charger, hard wired to a dedicated 15amp outlet.
2. Installed second marine deep cycle battery, and hard wired both batteries to the battery charger.
3. Charged batteries over night, and received a satisfactory green light indication on battery charger.
4. Installed DC system analog volt meter. Installed in power distribution panel, adjacent to old "good/bad" battery indicator. Hard wired new volt meter to existing volt meter. Tested satisfactory.
5. Installed jack line (safety line).
6. Finished fabrication of dinghy seat. Will paint tomorrow and install in dinghy Thursday.
7. Went for a much needed two hour sail today with Don and Jake.
Left ta dooos:
1. Install anchor cleat.
2. Install dinghy seat.
3. Test anchor system.
4. Test dragging dinghy.
5. Test motoring dinghy.
6. Test transferring from boat to dinghy and back.
7. Paint bulk head
8. Fabricate chart table
9. Stow boat
10. Varnish wood work
11. Evaluate fabrication of new awning.
12. New sail gaskets (4)
Now to wonder where tomorrow will take me. Grass? Plants? Boat? Man, maybe I'll get to them all!